Land infrastructure, layout planning, and FCDA Master Plan compliance across fifteen Abuja districts. Diaspora assistance available for clients managing development projects from abroad.
A plot of land in Abuja requires proper development to become usable. Nashville Properties manages the transformation of raw land into serviced plots ready for construction or sale. The first step is a feasibility study that examines the plot's location, size, and zoning classification under the FCDA Master Plan. Apo, Asokoro Extension, Guzape II, Katampe Extension, and Maitama II have stricter development controls, while Lugbe, Kuje, Kurudu, Dei-Dei, Kubwa, Jikwoyi, Kyami, Idu, and Pyakasa have different requirements. The findings are compiled into a report that guides every subsequent decision.
To begin, the development plan takes shape with road layouts designed to maximize plot utility and accessibility, drainage channels mapped to prevent waterlogging, and plot demarcation carefully calculated to meet minimum size requirements. The plan is then cross-referenced against AGIS records to confirm title validity and survey plan accuracy before anything moves forward.
After that, FCDA Master Plan compliance is addressed with mandatory residential setbacks of 6 metres front, 3 metres side, and 3 metres rear built into the design. Zoning and district use limitations are strictly observed, and the plan is submitted to the Department of Development Control for review and approval. No physical work begins until the necessary clearances are obtained.
Next, infrastructure work commences after approvals are secured. Roads are constructed to the specified widths and materials, drainage channels are excavated and lined to handle storm water runoff, and perimeter fencing is erected where required by the development plan. Survey pegs are placed to mark individual plot boundaries with precision, and the site begins its transformation from raw land into a structured development.
Then utilities follow with water supply lines laid according to the approved layout and electricity infrastructure installed where grid access is available. Access roads are completed, named, and recorded as the development takes its final shape. To complete the project, Nashville Properties prepares a comprehensive development file containing all plans, approvals, receipts, and correspondence. The survey plan is updated to reflect the new layout, and the completed development is handed over to the owner. For diaspora clients, regular photo updates and document management are provided throughout.
Start Your Development Project
Roads, drainage channels, and perimeter fencing are constructed according to the layout plan and FCDA Master Plan requirements. Each element is built to the specified width and material standard.

Water supply lines and electricity infrastructure are installed where grid access is available. Access roads are completed, named, and recorded in the development file.

End-to-end oversight of every stage, from feasibility studies and plan drafting to on-site inspections and final handover. Complete file management included.

Remote assistance for clients abroad. Site inspections are conducted on your behalf, with regular photo and video updates sent throughout the entire development lifecycle.
All developments adhere to FCDA Master Plan zoning and district use limitations. Mandatory residential setbacks of 6 metres front, 3 metres side, and 3 metres rear are incorporated.
Drawings are submitted to the Department of Development Control. Approvals are secured before any physical work commences on site.
Development plans are cross-referenced against AGIS records. Title validity and survey plan accuracy are confirmed before the layout is finalized.
The owner receives a complete file containing all documents, approvals, and correspondence. Everything is laid out in plain terms anyone can follow.